4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would

  • 0 replies
  • 492 views
*

Offline mechanic

  • *****
  • 2473
    • View Profile
    • Engineering Forum
Question: 4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers in 8 days?

Options are:

A.     4
B.     8
C.     12
D.     16

Correct answer is:

D.     16

 

With Quick-Reply you can write a post when viewing a topic without loading a new page. You can still use bulletin board code and smileys as you would in a normal post.

Warning: this topic has not been posted in for at least 120 days.
Unless you're sure you want to reply, please consider starting a new topic.

Name: Email:
Verification:
Type the letters shown in the picture
Listen to the letters / Request another image
Type the letters shown in the picture:
type: "engrz" without quotes: